Why buyers send us the difficult parts

Five reasons, and you can check every one of them on the first order: what we are willing to machine, who reads your drawing, how fast pricing comes back, how short the lead time is, and how often you hear from us while the job runs.

24 hQuotation
85CNC machines
±0.005mm typical
3Shifts per day
WeeklyProgress update
Why Far East High Tech

Five reasons, all of them checkable

Nothing below is a promise about attitude. Each one is either a machine we own, a person who answers, or a date you can hold us to.

  1. 01

    We quote the parts other shops decline

    Hardened material · complex geometry

    Hardened tool steel, thin walls, deep pockets, true position held across several set-ups — that is our normal work, not an exception we take on when the shop is quiet. Grades like SKD11, SKD61, D2, H13 and 17-4PH run here every week. Where a feature cannot be cut after heat treatment, Sodick wire-cut and die-sink EDM take it instead of asking you to relax the print, and Okamoto and Chevalier grinders bring the critical faces back to size.

    • Hard materialTool and stainless steel — SKD11 · SKD61 · D2 · H13 · 17-4PH · 420
    • Geometry3, 4 and 5-axis milling · thin-wall and deep-pocket parts
    • When milling stopsSodick wire-cut and die-sink EDM for sharp corners and tight radii
    • Back to sizeOkamoto and Chevalier grinding, typical ±0.005 mm
  2. 02

    The person answering your email is an engineer

    Engineering and sales are the same team

    Our sales staff are trained engineers, so the first reply already deals with the drawing instead of forwarding it. Feasibility, tolerance stack, fixturing, a material you want to swap — answered in the same message. You do not explain the same part three times to three people, and nothing is lost on the way from the inbox to the shop floor. Short threads, specific answers, and one contact who stays with the order until it ships.

    • Who reads the printAn engineer, not a sales inbox
    • Round tripsOne specific question rather than a guess or a holding reply
    • Drawing rulesThe 2D print governs over the STEP file
    • SubstitutionNo grade change reaches production without your written approval
  3. 03

    Short lead times, because nothing leaves the building

    One floor · three shifts

    Milling, turning, grinding, EDM and inspection sit on one floor in Ho Chi Minh City, and the plant runs three shifts a day. A part that needs four processes never leaves our control and never waits on a courier between shops — which is where most of the days go in an outsourced chain. That is what lets us hold 3–7 days on a prototype and 7–14 on a small batch.

    • Prototype3–7 days
    • Small batch7–14 days
    • Mass productionBy agreement, scheduled when the PO is accepted
    • Capacity85 CNC machines running three shifts a day
  4. 04

    A written update every week, without you asking

    You never have to chase the order

    While an order is open you get a progress note every week: which of the seven steps the job is on, what was finished since the last note, what comes next, and anything that could move the delivery date. If a problem appears you hear about it when we find it, with the options, rather than when the ship date slips.

    • FrequencyEvery week while the order is open
    • ContentsStep reached · quantity complete · next milestone · risks
    • Bad newsReported when found, together with the options
    • Straight to a callAnything that moves your delivery date
  5. 05

    Pricing back within 24 business hours

    Quotation turnaround

    Send a 2D PDF and a STEP or IGES file with the quantity and the target date. Feasibility and price come back inside one business day, reviewed by an engineer. If something on the print is missing or contradictory we ask one specific question the same day instead of quoting around it and correcting the price later.

    • TurnaroundWithin 24 business hours
    • What we need2D PDF + STEP / IGES · material · quantity · tolerance · finish
    • Missing informationOne specific question, asked the same day
    • Also byWhatsApp or Zalo — the same 24-hour clock
In numbers
24 hQuotation
3–7 daysPrototype
7–14 daysSmall batch
WeeklyProgress update
Reason 04, in practice

What the weekly update looks like

One short note, the same five lines every week, so you can forward it to your own team without rewriting it. No login, no portal to check — it arrives in your inbox.

If the answer to the last line is ever anything but unchanged, you get a call before the note.

Example — week 3
  • OrderPO 2451 — mounting bracket, 6061-T6, 250 pcs
  • Step04 of 07 — CNC machining, 180 of 250 complete
  • DoneFirst article approved, roughing complete on the balance
  • NextGrinding, then CMM report with inch and mm values
  • DeliveryUnchanged

Send one drawing and time us.

STEP / IGES + 2D PDF · Material grade · Quantity · Tolerance · Finish

Or write to qlcl@fe2tech.com · Call +84 707 733 399